Project Overview

Design, supply, install and support a ruggedised, private radio communication solution for a new 18-story residential construction development in Sydney’s metropolitan area over a term of 2-3 years. The solution must provide instant radio communications coverage, ensuring seamless operations across the entire construction site.

Key Challenges & Solutions

Crane Operations Communications

  • Implemented dedicated interference-free channels for crane operators
  • Installed Crane Spec’d Hands Free Mine Radio’s
  • Ensured crystal-clear communication between ground crews, site management and crane operators
  • Enhanced safety protocols through reliable communication channels, OH&S policies
  • Utilized high-grade construction radios with noise-cancelling features
  • Programmed Crane radio to ACMA specifications

Site-Wide Coverage Solution

  • Delivered complete coverage for cranes, site management, and traffic control
  • Facilitated radio coverage across an ever changing environment, i.e. basements, heights and obstacles
  • Seamless indoor/outdoor communication integration
  • Dedicated channels for different work teams
  • Emergency broadcast capability across all channels

Site Office Infrastructure

  • Custom antenna system installation for the site office
  • Enhanced signal strength through strategic antenna placement and programming
  • Reliable base station design and installation
  • Constant communication link to all site personnel

Safety & Compliance

  • Met all NSW construction safety requirements
  • Emergency channel priority override
  • Immediate all-site broadcast capability
  • Compliant with Australian construction communication standards and ACMA

Cost-Effective Implementation

  • Scalable solution growing with construction progress
  • Reduced equipment replacement needs through durability
  • MiningTelecoms Service Centre for repairs, parts and servicing
  • Minimized communication downtime
  • Long-term cost benefits through quality equipment selection

Results Achieved

  • Efficient, instant communications for maximum productivity
  • Zero Communication-Related Safety Incidents
  • 100% Site Coverage Achieved
  • Uninterrupted Crane / Dogman Communications
  • Multi-Level Technical Communications Support
  • Communication Equipment Repairs Achieved in 48-72 Hours

Client Testimonial

“The communication solution provided by MiningTelecoms Australia exceeded our expectations. The coverage and clarity across the site was impressive.”

– Project Manager, Landmark Construction

Equipment Deployed

Tait TP9300
Tait TM9300
RFI UHF Antenna Construction Site Office